ESA #7000-1118 · WSIB · $5M Liability

Electrical,
engineered.

Commercial & high-end residential electrical for the National Capital Region. EV fleets, panel upgrades, smart-home integration — designed, drawn, permitted, inspected.

DRG.
AM-04
Scale
1:1
Rev.
B / 2026
Featured in
Ottawa Business Journal·Electrical Business Magazine·Tesla Owners Ottawa·Solar Power Canada·CER 'Top 50 Contractors 2024'

// EV / Compatibility Configurator

Spec your charger.

Vehicle + usage + install location → live quote range. ESA permit, hardware, labour, inspection included.

01 / Vehicle
02 / Daily charging needs
03 / Install location
04 / Spec sheet
// Recommended_Build
REV. TESLA-M-26
Tesla
Tesla Wall Connector Gen 3
Charger output
32A continuous
L2 dedicated circuit, 40A breaker
Connector
Native Tesla / NEMA 14-50
4–6 hours install
Site
Attached garage
Shortest run from panel · best price
Estimated cost
$1,800–$2,400
Permit + ESA inspection included
Engineer's notes

Wi-Fi load-sharing for multi-vehicle households. Power-share across up to 6 units.

Schedule install · 613-355-3512 →

// Smart Integration

Wired for the modern home.

Certified installers for the platforms that actually deliver. No bloat, no off-brand controllers.

001/LUTRON

Lutron Caséta whole-home dimming

Multi-room scenes, daylight harvesting, Apple Home + SmartThings. Reliable RF mesh — no Wi-Fi dependency.

Spec sheet →
002/SPAN

Span smart panel installation

Full-load monitoring at the breaker. Dynamic load management lets you skip a 400A upgrade. iOS app native.

Spec sheet →
003/SCHNEIDER

Schneider Wiser energy management

Whole-home circuit-level metering. Time-of-use optimization with Hydro Ottawa rate plans.

Spec sheet →
004/CRESTRON

Crestron commercial control

Scene control, AV, climate, shading on one rack. We handle wiring, programming partner handles UI.

Spec sheet →
005/SONOS

Sonos in-ceiling integration

Architectural speakers with proper backboxes, fire-rated where required. Pre-wire during framing or retrofit.

Spec sheet →
006/TESLA

Tesla Powerwall + solar tie-in

Gateway 3, critical-loads subpanel, solar inverter integration. Storm Watch + off-grid ready.

Spec sheet →

// Capabilities

Technical specifications.

Service capacity100A — 1200A 3-phase
EV charger specup to 48A continuous · NEMA 14-50 / 6-50
Smart panelSpan / Lumin / Schneider compatible
Commercial voltage120/240V 1ph · 208V/480V 3ph
Generator switchingGenerac / Kohler ATS up to 200A
Solar tie-inEnphase / SolarEdge / Tesla compatible
Inspection authorityESA-filed · OESC compliant
Documentationstamped drawings · load calc · as-built

// Selected Work

Commercial portfolio.

PROJ. #100
Industrial
2024 · 800A 3-phase service upgrade

Vanier Industrial Park

208V/480V · ATS-tied · 4 sub-feeds
View case →
PROJ. #101
EV Fleet
2023 · 64-charger EV fleet install

Bank St Office Tower

ChargePoint CT4000 · load-managed
View case →
PROJ. #102
Retail
2024 · LED retrofit + occupancy sensors

Rideau Centre Retail

DLC-listed · 38% kWh reduction
View case →
PROJ. #103
Industrial
2023 · Backup generator + ATS

Gatineau Warehouse

Generac 48kW · 200A transfer
View case →
PROJ. #104
Office
2024 · Service upgrade + UPS feed

Westboro Dental Group

400A · isolated medical ground
View case →
PROJ. #105
EV Fleet
2024 · 28-stall employee EV lot

Kanata Tech Campus

Wallbox Commander · OCPP 2.0
View case →
PROJ. #106
Retail
2023 · Lutron + Crestron buildout

Hull Boutique Hotel

112 keys · DALI dimming
View case →
PROJ. #107
Office
2024 · 1200A service + smart metering

Orleans Logistics Hub

Eaton Pow-R-Line · sub-metering
View case →

// Case Study · 24-CS-006

Manor Park

6-Tesla family compound

A multi-generational compound on the Rockcliffe edge. Three Model X, two Model Y, one Cybertruck. The original 200A service was tripping the main during evening cluster-charging. Owner needed every car ready by 7 a.m. without thinking about it.

We pulled the load calc, drew the upgrade as a 400A overhead service with twin 200A panels — one dedicated to the EV bank. Six Tesla Wall Connectors hardwired in a daisy-chain with native power-share, sized to a 96A continuous bus.

Trenching from the new pole-mount transformer ran along the east property line. Square D QO panels, Cerro 2/0 copper service entrance, Carlon PVC underground. ESA inspector signed off on the same-day re-energization.

Result: All six chargers run simultaneously without breaker trips. Family charges overnight on off-peak rates. Power share dynamically allocates the 96A bus across whichever cars are plugged in.

Materials
Tesla Wall Connector ×6·Square D QO 200A ×2·Cerro 2/0 Cu·Carlon PVC underground·Eaton CH ATS
WC01WC02WC03WC04WC05WC06XFMR 75kVAPANEL B · 200A
SERVICE
200A → 400A
overhead 3-wire
CONTINUOUS LOAD
96A / 14kW pk
6× Wall Connector · power-share
Certifications
ESA Master Electrician·ESA Lic. #7000-1118·WSIB Compliant·CSA Registered·Tesla Certified Installer·ChargePoint Certified·Span Certified Installer·Generac Authorized Dealer

// The Team

Hands on every job.

DA
18 YRS · Master Electrician

Dre Adam

Commercial 3-phase + EV fleet

Every panel I touch leaves better than I found it.

KC
6 YRS · Engineering Tech

Kira Chen

Smart-home integration

Wiring is software now. I treat it that way.

TR
4 YRS · Apprentice → Journeyman 2025

Tomás Reyes

Residential EV + battery storage

Coming up the right way under Dre.

// Project Flow

Engineered, not improvised.

01

Site visit + load calc

Master electrician on-site. We walk the panel, check service capacity, identify load, calculate available headroom per OESC.

Estimated
Free · 60–90 min
02

Engineered drawings + permit submission

Stamped single-line, load calc, ESA permit application. We file everything with the authority having jurisdiction.

Estimated
3–5 business days
03

ESA inspection scheduled

We coordinate the ESA inspector for rough-in and final. You don't lift a finger on the paperwork.

Estimated
Booked at permit
04

Install

Materials staged, Hydro Ottawa power-down coordinated, work executed by ESA-licensed crew. Site cleaned, photos archived.

Estimated
1–3 days residential · 1–3 weeks commercial
05

Final ESA inspection + handoff documentation

Inspector signs off. You receive the ESA Certificate of Acceptance, as-built drawings, panel directory, photos — digitally archived.

Estimated
5–7 days post-install

// Service Calculator

Sized for your home.

Three inputs → recommended service capacity + upgrade range. Ballpark only — final via load calc.

Home size
EVs in household
Solar / battery storage
// Output_Spec
PRIORITY: Recommended
Recommended service
200A
Upgrade investment
$3,800 – $5,200

Standard 200A panel + ESA permit. 1-day install.

Book load calc · 613-355-3512

// Service Area

Both sides of the river.

Permit-pulling, ESA-inspecting, ON + QC licensed.

CentretownWestboroKanataOrleansBarrhavenManor ParkRockcliffeStittsvilleNepeanThe GlebeHullAylmerChelseaWakefieldGatineauManotick

// Technical FAQ

Common questions.

Permit submission and ESA review run 3–5 business days. Install itself is one day with a 4-hour Hydro Ottawa power-down. Final ESA inspection within a week of energization. Total elapsed: typically 10–14 business days.

// Project Inquiry

Start a project.

4 steps · ~60 seconds · we reply within 24h

01 / Type
02 / Property
03 / Timeline
04 / Contact
Step 01

What kind of project?

// Direct line · Master Electrician answers

Power your project.
Properly.

613-355-3512